Experience on Projects

Mr. Loock is a qualified Land Surveyor and is registered at the South African Council for Professional and Technical Surveyors. (PLS1096).
He has a B.Sc. (Land Surveying) degree and qualified in 1997 at the University of Pretoria and has over 23 years’ experience. Since June 1994 he has worked in South-Africa, Philippines, Mozambique, Ethiopia, Botswana, Zambia and Zimbabwe, Angola, Kenya, Malawi, Equatorial Guinea and Lesotho on various engineering and aerial survey projects. Fully compliant with existing survey control techniques, aerial and lidar survey, photo control, tachometry, staking out of roads, construction survey, taking of quantities and compiling topographical plans.
MAJOR PROJECTS
  
  • Realignment survey of road between Chinsali; and Nakonde in Zambia, ± 210km
  • Lesotho Border Road
  • Survey of Road between Chisekesi and Munyumbwe: Zambia (+/- 50km)
  • Photogrammetric survey of new alignment between Ressano Garcia and Maputo, Mozambique +- 100km
  • Lidar Survey of 2m perimeter above existing Chahora Bassa Dam wall
  • Control and detail survey of road between Adwa and Adigrat, Ethiopia 110km
  • Cuamba – Lichinga 350km
  • Survey of road and beach landing: Mozambique Gas Project
  • Chimoio – Espunga Bera, 230km
  • Molepolole – Lethlakeng 160km, Botswana
  • Digital Ortho photo for distribution of power lines ± 20 villages Lesotho
  • Nampula – Cuamba, Mozambique, 350km
  • Medupi Power Station
  • Quibaxe – Bengo, Angola 100km
  • Survey of Morupule Power Station: Botswana
  • Survey of Morrupule - Orapa Powerline
  • Survey of Pipeline route: Kwamhlanga
  • Staking and profiling +-15km of Power line in the Philippines.
  • Chimoio Manica – Chico Pipeline Route - +/- 100km – Mozambique
  • Control, staking and profiling of ± 300km of pipe lines in Botswana
  • Survey of Cahora Bassa Dam – Mozambique
  • Chipembe dam, Mozambique
  • Kasane & Kazungula ± 91km
  • Detail Survey – Huambo Airport – Angola
  • Survey of Turffontein Sewer lines
  • Detail Contour Survey of Maputo Airport site
  • Setting out of Sewer lines: 652 houses Sesheng
  • Detail Survey – Pemba Airport, Mozambique
  • Etwatwa Sewer Line
  • Survey of Nata Sewer Ponds
  • Beira Stormwater Masterplan
  • Survey of Sewerline and Ponds: Shakawe
  • 5 Bridge Sites Mozambique
  • Survey of Stormwater infrastructure Jwaneng Botswana
  • Survey of Bridge and Roads: Molepolole
  • Survey of Bridge site: Stockpoort
  • Detail contour survey of Beitbridge
  • FJ loock land Surveyors